Skip to content
STRATUSWORKFORCE SCAN
Menu

Conveyor Operators and Tenders

Control or tend conveyors or conveyor systems that move materials or products to and from stockpiles, processing stations, departments, or vehicles. May control speed and routing of materials or products.

22,930 people do this job in the US. $42,420 a year.

now
9%

of the working time. Estimate.

Kinds of work
  • 9%
  • 0%
  • 91%
0%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
Already

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 9% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 3%. With Claude Mythos Preview (early), measured in April 2026, 9%. Today's estimate: 9%.

0%5%10%15%20%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 1% within reachClaude 3.7 Sonnet, February 2025: 3% within reacho3, April 2025: 6% within reachGPT-5, August 2025: 7% within reachGemini 3 Pro, November 2025: 8% within reachClaude Opus 4.5, November 2025: 8% within reachGPT-5.2, December 2025: 8% within reachClaude Opus 4.6, February 2026: 9% within reachClaude Mythos Preview (early), April 2026: 9% within reachToday (estimate), September 2026: 9% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 23 tasks from .

TaskKind
Clean, sterilize, and maintain equipment, machinery, and work stations, using hand tools, shovels, brooms, chemicals, hoses, and lubricants.Done daily by most who do it. 12%38 min13 min to 1.3 hStays with people
Load, unload, or adjust materials or products on conveyors by hand, by using lifts, hoists, and scoops, or by opening gates, chutes, or hoppers.Done hourly or more by most who do it. 11%25 min8 min to 50 minStays with people
Operate elevator systems in conjunction with conveyor systems.Done hourly or more by most who do it.8%25 min8 min to 50 minStays with people
Observe conveyor operations and monitor lights, dials, and gauges to maintain specified operating levels and to detect equipment malfunctions.Done hourly or more by most who do it. 7%13 min4 min to 38 minStays with people
Observe packages moving along conveyors to identify packages, detect defective packaging, and perform quality control.Done hourly or more by most who do it. 6%17 min7 min to 1.3 hStays with people
Repair or replace equipment components or parts such as blades, rolls, and pumps.Done more than monthly by most who do it.6%1.3 h25 min to 2.5 hStays with people
Stop equipment or machinery and clear jams, using poles, bars, and hand tools, or remove damaged materials from conveyors.Done more than monthly by most who do it. 6%21 min8 min to 50 minStays with people
Move, assemble, and connect hoses or nozzles to material hoppers, storage tanks, conveyor sections or chutes, and pumps.Done more than weekly by most who do it.5%25 min8 min to 42 minStays with people
Record production data such as weights, types, quantities, and storage locations of materials, as well as equipment performance problems and downtime.Done daily by most who do it. 4%13 min4 min to 29 min100%Half by now
Position deflector bars, gates, chutes, or spouts to divert flow of materials from one conveyor onto another conveyor.Done hourly or more by most who do it. 4%13 min4 min to 21 minStays with people
Join sections of conveyor frames at temporary working areas, and connect power units.Done daily by most who do it.4%1.3 h25 min to 3.3 hStays with people
Operate consoles to control automatic palletizing equipment.Done hourly or more by most who do it.4%17 min7 min to 50 minStays with people

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025).

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025).