Skip to content
STRATUSWORKFORCE SCAN
Menu

Industrial Engineers

Design, develop, test, and evaluate integrated systems for managing industrial production processes, including human work factors, quality control, inventory control, logistics and material flow, cost analysis, and production coordination.

365,740 people do this job in the US. $102,440 a year.

now
16%

of the working time. Estimate.

Kinds of work
  • 95%
  • 2%
  • 3%
4%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
June 2027

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 95% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 9%. Today's estimate: 16%.

0%5%10%15%20%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 0% within reachGPT-5, August 2025: 0% within reachGemini 3 Pro, November 2025: 1% within reachClaude Opus 4.5, November 2025: 1% within reachGPT-5.2, December 2025: 1% within reachClaude Opus 4.6, February 2026: 1% within reachClaude Mythos Preview (early), April 2026: 9% within reachToday (estimate), September 2026: 16% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 20 tasks from .

TaskKind
Plan and establish sequence of operations to fabricate and assemble parts or products and to promote efficient utilization.Done more than weekly by most who do it. 16%1 work day2.5 h to 2.1 work days6%Half by Aug 2027
Recommend methods for improving utilization of personnel, material, and utilities.Done more than weekly by most who do it. 12%6.7 h1.7 h to 1.7 work days9%Half by Jul 2027
Develop manufacturing methods, labor utilization standards, and cost analysis systems to promote efficient staff and facility utilization.Done more than monthly by most who do it. 12%1.7 work days4.2 h to 1 work week2%Half by Feb 2028
Draft and design layout of equipment, materials, and workspace to illustrate maximum efficiency using drafting tools and computer.Done more than yearly by most who do it. 9%1 work day3.3 h to 2.5 work days5%Half by Jul 2027
Analyze statistical data and product specifications to determine standards and establish quality and reliability objectives of finished product.Done more than monthly by most who do it. 8%6.7 h2.5 h to 2.5 work days9%Half by Jul 2027
Estimate production costs, cost saving methods, and the effects of product design changes on expenditures for management review, action, and control.Done daily by most who do it. 6%5 h1.7 h to 1.7 work days17%Half by Apr 2027
Evaluate precision and accuracy of production and testing equipment and engineering drawings to formulate corrective action plan.Done more than monthly by most who do it. 6%5 h2.5 h to 1.7 work days20%Half by Feb 2027
Communicate with management and user personnel to develop production and design standards.Done more than weekly by most who do it. 5%3.3 h1.7 h to 6.7 h49%Half by now
Coordinate and implement quality control objectives, activities, or procedures to resolve production problems, maximize product reliability, or minimize costs.Done more than yearly by most who do it. 4%6.7 h2.5 h to 3.3 work days9%Half by Sep 2027
Implement methods and procedures for disposition of discrepant material and defective or damaged parts, and assess cost and responsibility.Done more than monthly by most who do it. 3%3.3 h1.7 h to 6.7 h49%Half by now
Direct workers engaged in product measurement, inspection, and testing activities to ensure quality control and reliability.Done more than monthly by most who do it. 3%1.7 h38 min to 5 hStays with people
Apply statistical methods and perform mathematical calculations to determine manufacturing processes, staff requirements, and production standards.Done more than monthly by most who do it. 3%5 h1.7 h to 2.1 work days15%Half by Jun 2027

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.