Skip to content
STRATUSWORKFORCE SCAN
Menu

Architects, Except Landscape and Naval

Plan and design structures, such as private residences, office buildings, theaters, factories, and other structural property.

106,770 people do this job in the US. $99,280 a year.

now
7%

of the working time. Estimate.

Kinds of work
  • 93%
  • 5%
  • 2%
8%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
February 2028

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 93% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 4%. Today's estimate: 7%.

0%5%10%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 0% within reachGPT-5, August 2025: 0% within reachGemini 3 Pro, November 2025: 0% within reachClaude Opus 4.5, November 2025: 0% within reachGPT-5.2, December 2025: 0% within reachClaude Opus 4.6, February 2026: 0% within reachClaude Mythos Preview (early), April 2026: 4% within reachToday (estimate), September 2026: 7% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 25 tasks from .

TaskKind
Prepare scale drawings or architectural designs, using computer-aided design or other tools.Done hourly or more by most who do it. 8%3.3 h1.7 h to 1.7 work days32%Half by Jan 2027
Prepare information regarding design, structure specifications, materials, color, equipment, estimated costs, or construction time.Done daily by most who do it. AI observed on this task.8%6.7 h1.7 h to 2.5 work days8%Half by Sep 2027
Create three-dimensional or interactive representations of designs, using computer-assisted design software.Done more than yearly by most who do it. 8%6.7 h1.7 h to 3.3 work days7%Half by Nov 2027
Prepare contract documents for building contractors.Done hourly or more by most who do it. AI observed on this task.8%1.7 work days3.3 h to 1 work week2%Half by Apr 2028
Integrate engineering elements into unified architectural designs.Done daily by most who do it. 8%1.7 work days3.3 h to 1 work week2%Half by Apr 2028
Plan or design structures such as residences, office buildings, theatres, factories, or other structural properties in accordance with environmental, safety, or other regulations.Done daily by most who do it. 8%2.1 work days6.7 h to 1.3 work weeks1%Half by Mar 2028
Design environmentally sound structural upgrades to existing buildings, such as natural lighting systems, green roofs, or rainwater collection systems.Done more than yearly by most who do it. 8%2.1 work days3.3 h to 1.7 work weeks1%Half by Sep 2028
Design structures that incorporate environmentally friendly building practices or concepts, such as Leadership in Energy and Environmental Design (LEED) standards.Done more than monthly by most who do it. 8%2.1 work days3.3 h to 1.7 work weeks1%Half by Sep 2028
Develop final construction plans that include aesthetic representations of the structure or details for its construction.Done daily by most who do it. 8%3.3 work days6.7 h to 2.7 work weeks0%Half by Dec 2028
Plan layouts of structural architectural projects.Done more than monthly by most who do it. 6%6.7 h1.7 h to 3.3 work days7%Half by Nov 2027
Design or plan construction of green building projects to minimize adverse environmental impact or conserve energy.Done daily by most who do it. 5%2.1 work days3.3 h to 1.7 work weeks1%Half by Sep 2028
Prepare operating and maintenance manuals, studies, or reports.Done yearly or less by most who do it. 4%1.7 work days3.3 h to 1 work week2%Half by Apr 2028

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025).

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025).