Skip to content
STRATUSWORKFORCE SCAN
Menu

Weighers, Measurers, Checkers, and Samplers, Recordkeeping

Weigh, measure, and check materials, supplies, and equipment for the purpose of keeping relevant records. Duties are primarily clerical by nature. Includes workers who collect and keep record of samples of products or materials.

53,300 people do this job in the US. $46,380 a year.

now
21%

of the working time. Estimate.

Kinds of work
  • 21%
  • 2%
  • 77%
0%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
Already

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 21% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 4%. With Claude Mythos Preview (early), measured in April 2026, 21%. Today's estimate: 21%.

0%10%20%30%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 1% within reachClaude 3.7 Sonnet, February 2025: 4% within reacho3, April 2025: 12% within reachGPT-5, August 2025: 14% within reachGemini 3 Pro, November 2025: 17% within reachClaude Opus 4.5, November 2025: 17% within reachGPT-5.2, December 2025: 18% within reachClaude Opus 4.6, February 2026: 18% within reachClaude Mythos Preview (early), April 2026: 21% within reachToday (estimate), September 2026: 21% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 18 tasks from .

TaskKind
Inspect products and examination records to determine the number of defects per worker and the reasons for examiners' rejections.Done hourly or more by most who do it.18%38 min17 min to 1.7 hStays with people
Document quantity, quality, type, weight, test result data, and value of materials or products to maintain shipping, receiving, and production records and files.Done hourly or more by most who do it. 9%13 min4 min to 38 min99%Half by now
Examine products or materials, parts, subassemblies, and packaging for damage, defects, or shortages, using specification sheets, gauges, and standards charts.Done daily by most who do it. 9%17 min8 min to 50 minStays with people
Maintain, monitor, and clean work areas, such as recycling collection sites, drop boxes, counters and windows, and areas around scale houses.Done daily by most who do it. 8%25 min8 min to 50 minStays with people
Weigh or measure materials, equipment, or products to maintain relevant records, using volume meters, scales, rules, or calipers.Done hourly or more by most who do it. 7%8 min3 min to 25 minStays with people
Compare product labels, tags, or tickets, shipping manifests, purchase orders, and bills of lading to verify accuracy of shipment contents, quality specifications, or weights.Done hourly or more by most who do it.7%13 min4 min to 38 min99%Half by now
Remove from stock products or loads not meeting quality standards, and notify supervisors or appropriate departments of discrepancies or shortages.Done daily by most who do it.5%13 min4 min to 33 minStays with people
Unload or unpack incoming shipments.Done daily by most who do it.4%25 min8 min to 1.3 hStays with people
Fill orders for products and samples, following order tickets, and forward or mail items.Done daily by most who do it.4%21 min8 min to 50 minStays with people
Sort products or materials into predetermined sequences or groupings for display, packing, shipping, or storage.Done daily by most who do it.4%17 min7 min to 50 minStays with people
Store samples of finished products in labeled cartons and record their location.Done daily by most who do it.4%13 min4 min to 25 minStays with people
Collect product samples and prepare them for laboratory analysis or testing.Done daily by most who do it. 4%17 min8 min to 38 minStays with people

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.