Skip to content
STRATUSWORKFORCE SCAN
Menu

Sawing Machine Setters, Operators, and Tenders, Wood

Set up, operate, or tend wood sawing machines. May operate computer numerically controlled (CNC) equipment. Includes lead sawyers.

40,850 people do this job in the US. $42,770 a year.

now
8%

of the working time. Estimate.

Kinds of work
  • 8%
  • 0%
  • 92%
0%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
Already

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 8% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 1%. With Claude Mythos Preview (early), measured in April 2026, 8%. Today's estimate: 8%.

0%5%10%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 1% within reacho3, April 2025: 4% within reachGPT-5, August 2025: 5% within reachGemini 3 Pro, November 2025: 6% within reachClaude Opus 4.5, November 2025: 6% within reachGPT-5.2, December 2025: 7% within reachClaude Opus 4.6, February 2026: 7% within reachClaude Mythos Preview (early), April 2026: 8% within reachToday (estimate), September 2026: 8% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 22 tasks from .

TaskKind
Set up, operate, or tend saws or machines that cut or trim wood to specified dimensions, such as circular saws, band saws, multiple-blade sawing machines, scroll saws, ripsaws, or crozer machines.Done daily by most who do it. 15%25 min8 min to 1.7 hStays with people
Examine logs or lumber to plan the best cuts.Done daily by most who do it.9%25 min8 min to 50 minStays with people
Monitor sawing machines, adjusting speed and tension and clearing jams to ensure proper operation.Done daily by most who do it. 7%17 min8 min to 38 minStays with people
Adjust saw blades, using wrenches and rulers, or by turning handwheels or pressing pedals, levers, or panel buttons.Done daily by most who do it. 6%13 min4 min to 29 minStays with people
Cut grooves, bevels, or miters, saw curved or irregular designs, and sever or shape metals, according to specifications or work orders.Done hourly or more by most who do it.6%25 min8 min to 1.7 hStays with people
Trim lumber to straighten rough edges or remove defects, using circular saws.Done hourly or more by most who do it.5%13 min4 min to 33 minStays with people
Inspect and measure workpieces to mark for cuts and to verify the accuracy of cuts, using rulers, squares, or caliper rules.Done hourly or more by most who do it. 5%7 min3 min to 17 minStays with people
Adjust bolts, clamps, stops, guides, or table angles or heights, using hand tools.Done daily by most who do it.4%13 min4 min to 33 minStays with people
Examine blueprints, drawings, work orders, or patterns to determine equipment set-up or selection details, procedures to be used, or dimensions of final products.Done daily by most who do it.4%17 min4 min to 33 min99%Half by now
Guide workpieces against saws, saw over workpieces by hand, or operate automatic feeding devices to guide cuts.Done daily by most who do it. 4%10 min3 min to 25 minStays with people
Select saw blades, types or grades of stock, or cutting procedures to be used, according to work orders or supervisors' instructions.Done daily by most who do it.4%13 min4 min to 25 min100%Half by now
Mount and bolt sawing blades or attachments to machine shafts.Done daily by most who do it. 4%21 min8 min to 50 minStays with people

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.