Skip to content
STRATUSWORKFORCE SCAN
Menu

Food and Tobacco Roasting, Baking, and Drying Machine Operators and Tenders

Operate or tend food or tobacco roasting, baking, or drying equipment, including hearth ovens, kiln driers, roasters, char kilns, and vacuum drying equipment.

20,370 people do this job in the US. $44,810 a year.

now
8%

of the working time. Estimate.

Kinds of work
  • 8%
  • 0%
  • 92%
0%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
Already

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 8% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 5%. With Claude Mythos Preview (early), measured in April 2026, 8%. Today's estimate: 8%.

0%5%10%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 1% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 1% within reacho1, December 2024: 2% within reachClaude 3.7 Sonnet, February 2025: 5% within reacho3, April 2025: 7% within reachGPT-5, August 2025: 7% within reachGemini 3 Pro, November 2025: 8% within reachClaude Opus 4.5, November 2025: 8% within reachGPT-5.2, December 2025: 8% within reachClaude Opus 4.6, February 2026: 8% within reachClaude Mythos Preview (early), April 2026: 8% within reachToday (estimate), September 2026: 8% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 19 tasks from .

TaskKind
Operate or tend equipment that roasts, bakes, dries, or cures food items such as cocoa and coffee beans, grains, nuts, and bakery products.Done hourly or more by most who do it. 28%50 min25 min to 2.5 hStays with people
Observe flow of materials and listen for machine malfunctions, such as jamming or spillage, and notify supervisors if corrective actions fail.Done hourly or more by most who do it. 7%13 min4 min to 25 minStays with people
Clean equipment with steam, hot water, and hoses.Done daily by most who do it.6%38 min13 min to 1.7 hStays with people
Record production data, such as weight and amount of product processed, type of product, and time and temperature of processing.Done hourly or more by most who do it. 6%8 min4 min to 17 min100%Half by now
Set temperature and time controls, light ovens, burners, driers, or roasters, and start equipment, such as conveyors, cylinders, blowers, driers, or pumps.Done daily by most who do it. 6%17 min8 min to 38 minStays with people
Fill or remove product from trays, carts, hoppers, or equipment, using scoops, peels, or shovels, or by hand.Done hourly or more by most who do it. 6%13 min4 min to 33 minStays with people
Observe, feel, taste, or otherwise examine products during and after processing to ensure conformance to standards.Done hourly or more by most who do it. 5%7 min3 min to 13 minStays with people
Weigh or measure products, using scale hoppers or scale conveyors.Done hourly or more by most who do it. 5%8 min3 min to 17 minStays with people
Observe temperature, humidity, pressure gauges, and product samples and adjust controls, such as thermostats and valves, to maintain prescribed operating conditions for specific stages.Done hourly or more by most who do it. 5%8 min3 min to 21 minStays with people
Open valves, gates, or chutes or use shovels to load or remove products from ovens or other equipment.Done hourly or more by most who do it.4%13 min4 min to 25 minStays with people
Push racks or carts to transfer products to storage, cooling stations, or the next stage of processing.Done hourly or more by most who do it.4%8 min4 min to 17 minStays with people
Clear or dislodge blockages in bins, screens, or other equipment, using poles, brushes, or mallets.Done daily by most who do it.4%13 min4 min to 38 minStays with people

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025).

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025).