Skip to content
STRATUSWORKFORCE SCAN
Menu

Millwrights

Install, dismantle, or move machinery and heavy equipment according to layout plans, blueprints, or other drawings.

40,330 people do this job in the US. $65,700 a year.

now
0%

of the working time. Estimate.

Kinds of work
  • 0%
  • 0%
  • 100%
0%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
No desk work

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 0% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 0%. Today's estimate: 0%.

0%5%10%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 0% within reachGPT-5, August 2025: 0% within reachGemini 3 Pro, November 2025: 0% within reachClaude Opus 4.5, November 2025: 0% within reachGPT-5.2, December 2025: 0% within reachClaude Opus 4.6, February 2026: 0% within reachClaude Mythos Preview (early), April 2026: 0% within reachToday (estimate), September 2026: 0% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 23 tasks from .

TaskKind
Assemble and install equipment, using hand tools and power tools.Done daily by most who do it. 9%5 h1.7 h to 2.1 work daysStays with people
Assemble machines, and bolt, weld, rivet, or otherwise fasten them to foundation or other structures, using hand tools and power tools.Done daily by most who do it. 9%6.7 h2.5 h to 2.5 work daysStays with people
Dismantle machinery and equipment for shipment to installation site, performing installation and maintenance work as part of team.Done more than yearly by most who do it. 9%1.3 work days3.3 h to 4.2 work daysStays with people
Construct foundation for machines, using hand tools and building materials such as wood, cement, and steel.Done more than monthly by most who do it. 8%1.3 work days3.3 h to 4.2 work daysStays with people
Attach moving parts and subassemblies to basic assembly unit, using hand tools and power tools.Done more than weekly by most who do it. 6%3.3 h50 min to 6.7 hStays with people
Weld, repair, and fabricate equipment or machinery.Done daily by most who do it. 6%5 h1.7 h to 1.3 work daysStays with people
Dismantle machines, using hammers, wrenches, crowbars, and other hand tools.Done daily by most who do it. 6%3.3 h50 min to 1.7 work daysStays with people
Replace defective parts of machine, or adjust clearances and alignment of moving parts.Done daily by most who do it. 5%2.5 h50 min to 6.7 hStays with people
Position steel beams to support bedplates of machines and equipment, using blueprints and schematic drawings to determine work procedures.Done more than weekly by most who do it. 4%5 h1.7 h to 1.7 work daysStays with people
Conduct preventative maintenance and repair, and lubricate machines and equipment.Done daily by most who do it. 4%2.5 h25 min to 6.7 hStays with people
Move machinery and equipment, using hoists, dollies, rollers, and trucks.Done daily by most who do it. 4%2.5 h25 min to 1 work dayStays with people
Fabricate and dismantle parts, equipment, and machines, using a cutting torch or other cutting equipment.Done daily by most who do it. 4%3.3 h1.3 h to 6.7 hStays with people

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025).

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025).