Skip to content
STRATUSWORKFORCE SCAN
Menu

Mechanical Engineering Technologists and Technicians

Apply theory and principles of mechanical engineering to modify, develop, test, or adjust machinery and equipment under direction of engineering staff or physical scientists.

36,190 people do this job in the US. $74,510 a year.

now
16%

of the working time. Estimate.

Kinds of work
  • 53%
  • 1%
  • 46%
7%

Measured, from Anthropic's usage data (2025). Counts help on part of a task.

Half the desk work within reach
April 2027

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 53% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 4.4 h long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 12%. Today's estimate: 16%.

0%5%10%15%20%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 1% within reachGPT-5, August 2025: 1% within reachGemini 3 Pro, November 2025: 2% within reachClaude Opus 4.5, November 2025: 2% within reachGPT-5.2, December 2025: 3% within reachClaude Opus 4.6, February 2026: 3% within reachClaude Mythos Preview (early), April 2026: 12% within reachToday (estimate), September 2026: 16% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

The tasks

Sorted by . 30 tasks from .

TaskKind
Assemble or disassemble complex mechanical systems.Done more than weekly by most who do it. 12%5 h1.7 h to 1.7 work daysStays with people
Design specialized or customized equipment, machines, or structures.Done more than weekly by most who do it. 12%3.1 work days6.7 h to 1.7 work weeks0%Half by Aug 2028
Test machines, components, materials, or products to determine characteristics such as performance, strength, or response to stress.Done daily by most who do it. 10%3.3 h1.7 h to 1.7 work daysStays with people
Calculate required capacities for equipment of proposed system to obtain specified performance and submit data to engineering personnel for approval.Done daily by most who do it. 7%2.5 h50 min to 6.7 h46%Half by Oct 2026
Set up prototype and test apparatus and operate test controlling equipment to observe and record prototype test results.Done more than yearly by most who do it.6%4.2 h1.7 h to 1.7 work daysStays with people
Devise, fabricate, or assemble new or modified mechanical components for products such as industrial machinery or equipment, and measuring instruments.5%1 work day3.3 h to 4.2 work daysStays with people
Set up and conduct tests of complete units and components under operational conditions to investigate proposals for improving equipment performance.Done more than yearly by most who do it. 4%5 h2.1 h to 2.1 work daysStays with people
Prepare specifications, designs, or sketches for machines, components, or systems related to the generation, transmission, or use of mechanical or fluid energy.Done more than monthly by most who do it. AI observed on this task.4%5 h1.7 h to 2.1 work days15%Half by Jun 2027
Design molds, tools, dies, jigs, or fixtures for use in manufacturing processes.Done more than monthly by most who do it. 4%1 work day2.5 h to 3.1 work days5%Half by Oct 2027
Assist engineers to design, develop, test, or manufacture industrial machinery, consumer products, or other equipment.Done more than weekly by most who do it. 4%3.3 h1.3 h to 1.7 work daysStays with people
Conduct failure analyses, document results, and recommend corrective actions.Done more than yearly by most who do it. 4%5 h1.7 h to 2.1 work days15%Half by Jun 2027
Prepare layouts of machinery, tools, plants, or equipment.Done daily by most who do it. 4%5 h1.7 h to 2.1 work days15%Half by Jun 2027

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025).

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025).