Skip to content
STRATUSWORKFORCE SCAN

Hydroelectric Production Managers

In short: today's best AI models could do about 21% of this job's working time (projected from METR's April 2026 measurement and Epoch's November 2026 index) if the work were set up for them, and about 66% by the end of 2028 if progress keeps its long-run pace. The people and hands-on work, about 30% of the time, stays with people.

Compare with another job

Manage operations at hydroelectric power generation facilities. Maintain and monitor hydroelectric plant equipment for efficient and safe plant operations.

$126,060 a year (for the broader BLS group this job sits in).

A typical 40-hour week

Not yet reviewed task by task
  • AI could take on8 h
  • A person checks AI's work0 h
  • Desk work AI can't do yet20 h
  • Stays with people12 h

Hydroelectric Production Managers, now: of a 40-hour week, AI could take on 8 hours, 0 hours become checking its work, 20 hours are desk work it can't do yet, and 12 hours stay with people.

The largest pieces: Provide technical direction in the erection or commissioning of hydroelectric equipment or supporting electrical or mechanical systems (about 2 h); Plan or coordinate hydroelectric production operations to meet customer requirements (about 2 h); Develop or implement policy evaluation procedures for hydroelectric generation activities (about 2 h).

Estimates for a typical week of this job, if progress keeps its long-run pace, counting work the best models finish four times in five. Every task is below.

now
21%

of the working time. Now is projected from METR's April 2026 measurement and Epoch's November 2026 index.

Kinds of work
  • 70%
  • 15%
  • 15%
1%

of the work: Anthropic's measure of what people already bring to Claude at work (2025). It counts help with part of a task, so it can be higher than the share within reach.

Half the desk work within reach
June 2027

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 70% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030
Change assumptionsLong-run pace, four in five

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 2.4 work days long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 5%. Today's estimate: 21%.

0%10%20%30%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 0% within reachGPT-5, August 2025: 1% within reachGemini 3 Pro, November 2025: 1% within reachClaude Opus 4.5, November 2025: 1% within reachGPT-5.2, December 2025: 2% within reachClaude Opus 4.6, February 2026: 2% within reachClaude Mythos Preview (early), April 2026: 5% within reachToday (estimate), November 2026: 21% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

Measured use over time

Of the Claude.ai conversations Anthropic sampled and tied to a work task, no reportable share went to this job's tasks in May 2026; 0 of its 18 tasks showed up. Within each of Anthropic's methods, never across a change: none to 0.0034% (released February and March 2025); 0.0017% to none (August 2025 to February 2026).

0%0.0025%0.005%20252026released February 2025: nonereleased March 2025: 0.0034%the week of Aug 4, 2025: 0.0017%the week of Nov 13, 2025: 0.0018%the week of Feb 5, 2026: noneApril 2026: noneMay 2026: none
Each dot is one release's sample. A line joins releases made by the same method; a change of method starts a new line. Point at a dot for its window.
Each release
ConversationsShareRankTasks seen
Released February 2025nonen/a0 of 18
Released March 20250.0034%619 of 7032 of 18
The week of Aug 4, 20250.0017%646 of 6551 of 18
The week of Nov 13, 20250.0018%656 of 6721 of 18
The week of Feb 5, 2026nonen/a0 of 18
April 2026nonen/a0 of 18
May 2026nonen/a0 of 18

Measured, not estimated: Anthropic's samples of Claude.ai conversations, each tied by a model to an O*NET task, from the Anthropic Economic Index. It says where Claude's use goes, not how much of this job's working time it covers, so it is not on the same scale as the reach above. The releases differ in their sample, their classifier and the smallest share they report (the June 2026 file rounds each task to a hundredth of a percent, so a smaller task reads as none), which is why a change of method starts a new line. At least 96% of each older release's task-tied use matched this site's tasks, and all of the newest. Claude.ai only, so use through other tools and other companies' models is not in it. Every job ranked.

Robots and the physical work

Anthropic rates 8% of this job's working time as physical work. For 8% of the working time, a robot has been shown doing most of the task somewhere: 8% in a structured facility. 0.16 of 3, the 471st highest of the 923 jobs.

  • Not physical 92%
  • In a structured facility 8%

Anthropic's rating, not this site's estimate: Claude Opus 5, searching the web, rated each physical O*NET task by the kind of setting in which a robot it could cite (deployed, sold or demonstrated) does most of the task, weighted by its own estimate of each task's share of the time (What work can robots do?, September 30, 2026, data CC BY 4.0; every job ranked). A robot shown somewhere is not a robot in your building: cost, setup and safety decide that. The share within reach on this page still counts no body work. The robot behind each rated task is under the task below.

The tasks

Sorted by . 18 tasks from .

TaskKind
Develop or implement projects to improve efficiency, economy, or effectiveness of hydroelectric plant operations.Done more than yearly by most who do it. 15%4.2 work days6.7 h to 2.5 work weeks6%Half by Feb 2028
Plan or manage hydroelectric plant upgrades.Done yearly or less by most who do it. 15%4.2 work days1 work day to 3.5 work weeks6%Half by Feb 2028
Develop or implement policy evaluation procedures for hydroelectric generation activities.Done more than yearly by most who do it. 12%1.7 work days3.3 h to 4.2 work days31%Half by Mar 2027
Direct operations, maintenance, or repair of hydroelectric power facilities.Done daily by most who do it. 10%3.3 h50 min to 6.7 hStays with people
Provide technical direction in the erection or commissioning of hydroelectric equipment or supporting electrical or mechanical systems.Done more than yearly by most who do it. 10%1.3 work days3.3 h to 4.2 work days44%Half by Dec 2026
Develop or review budgets, annual plans, power contracts, power rates, standing operating procedures, power reviews, or engineering studies.Done more than yearly by most who do it. 6%2.1 work days3.3 h to 1.3 work weeks18%Half by Jul 2027
Supervise hydropower plant equipment installations, upgrades, or maintenance.Done more than yearly by most who do it. 6%5 h1.7 h to 2.1 work daysStays with people
Plan or coordinate hydroelectric production operations to meet customer requirements.Done daily by most who do it. 5%3.3 h50 min to 1 work day86%Half by now
Supervise or monitor hydroelectric facility operations to ensure that generation or mechanical equipment conform to applicable regulations or standards.Done daily by most who do it. 4%2.5 h50 min to 6.7 hStays with people
Inspect hydroelectric facilities, including switchyards, control houses, or relay houses, for normal operation or adherence to safety standards.Done daily by most who do it. Robots: in a structured facility, Boston Dynamics Spot + Energy Robotics (now Korial) autonomous inspection software (demonstrated). Anthropic's rating.4%2.1 h50 min to 4.2 hStays with people
Monitor or inspect hydroelectric equipment, such as hydro-turbines, generators, or control systems.Done daily by most who do it. 3%1.7 h38 min to 5 hStays with people
Maintain records of hydroelectric facility operations, maintenance, or repairs.Done daily by most who do it. 2%50 min17 min to 2.5 h100%Half by now

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025). Counts are for the broader BLS group this job sits in.

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025). Counts are for the broader BLS group this job sits in.

Questions about this job

How much of the work of Hydroelectric Production Managers is within reach of AI now?
An estimated 21% of the working time is within reach of AI models now and 66% by the end of 2028, on METR's long-run pace at four in five (48% to 70% across the three paces the site shows). Within reach means a model could finish work that long at that reliability. It is not a forecast of jobs lost or of savings.
Which tasks of Hydroelectric Production Managers come within reach first?
Weighted by the time each takes, the tasks with the most within reach now (projected from METR's April 2026 measurement and Epoch's November 2026 index) are: Provide technical direction in the erection or commissioning of hydroelectric equipment or supporting electrical or mechanical systems (44% of the task's time now, 100% by the end of 2028); Plan or coordinate hydroelectric production operations to meet customer requirements (86% of the task's time now, 100% by the end of 2028); and Develop or implement policy evaluation procedures for hydroelectric generation activities (31% of the task's time now, 100% by the end of 2028).
Which tasks of Hydroelectric Production Managers stay with people?
Tasks that are people work or body work are not counted as within reach at any date. The largest: Direct operations, maintenance, or repair of hydroelectric power facilities; Supervise hydropower plant equipment installations, upgrades, or maintenance; and Supervise or monitor hydroelectric facility operations to ensure that generation or mechanical equipment conform to applicable regulations or standards. Together such tasks are about 30% of the working time.
Do people already use AI for the work of Hydroelectric Production Managers?
In the Claude.ai conversations Anthropic sampled for May 2026, no reportable share went to this job's tasks. Anthropic's labor market measure puts the share of the job's tasks seen in real Claude use at work at 1%. These are measures of use, not of how much of the work AI could finish, and they cover Claude only.
Can robots do the physical work of Hydroelectric Production Managers?
Anthropic's robot exposure rating (September 2026) finds 8% of the working time is physical work, and that a robot has been shown doing most of the task, somewhere, for 8% of the working time, 8% in a structured facility. Its index is 0.16 of 3. One example: Boston Dynamics Spot + Energy Robotics (now Korial) autonomous inspection software for "inspect hydroelectric facilities, including switchyards, control houses, or relay houses, for normal operation or adherence to safety standards". A robot shown somewhere is not one in every workplace; this site's own estimates still count no physical work as within reach.
How is this estimated?
From the 18 tasks O*NET lists for the occupation, each with an estimated length checked against GDPval and a share of the working time, each classed as desk, people or body work, and METR's measurements of how long a task the best AI models can finish, carried forward to the date from the latest, Claude Mythos Preview (early) in April 2026. Data checked November 10, 2026.

How the estimates are made

This job in your state or metro area
Embed these figures on your site

A small card with the share of working time within reach now and at the end of 2027, 2028 and 2030, the date and a link back. Free under CC BY 4.0; the card carries the credit.

See the card

Your own version of this job

The page above is the occupation. Your job is your title and what you actually do: give both, and they are read against these tasks in your browser, nothing sent anywhere. The headline is free: how much of your working time is within reach now and by the end of 2028, and how many of the tasks your description names.

This occupation has not been reviewed task by task yet, so the full personal report is not offered for it; 402 of 923 occupations are reviewed so far, largest first.