Skip to content
STRATUSWORKFORCE SCAN

Geothermal Production Managers

In short: today's best AI models could do about 43% of this job's working time (projected from METR's April 2026 measurement and Epoch's November 2026 index) if the work were set up for them, and about 74% by the end of 2028 if progress keeps its long-run pace. The people and hands-on work, about 26% of the time, stays with people.

Compare with another job

Manage operations at geothermal power generation facilities. Maintain and monitor geothermal plant equipment for efficient and safe plant operations.

$126,060 a year (for the broader BLS group this job sits in).

A typical 40-hour week

Not yet reviewed task by task
  • AI could take on17 h
  • A person checks AI's work0 h
  • Desk work AI can't do yet13 h
  • Stays with people10 h

Geothermal Production Managers, now: of a 40-hour week, AI could take on 17 hours, 0 hours become checking its work, 13 hours are desk work it can't do yet, and 10 hours stay with people.

The largest pieces: Oversee geothermal plant operations, maintenance, and repairs to ensure compliance with applicable standards or regulations (about 4 h); Develop operating plans and schedules for geothermal operations (about 4 h); Identify opportunities to improve plant electrical equipment, controls, or process control methodologies (about 2 h).

Estimates for a typical week of this job, if progress keeps its long-run pace, counting work the best models finish four times in five. Every task is below.

now
43%

of the working time. Now is projected from METR's April 2026 measurement and Epoch's November 2026 index.

Kinds of work
  • 74%
  • 1%
  • 24%
1%

of the work: Anthropic's measure of what people already bring to Claude at work (2025). It counts help with part of a task, so it can be higher than the share within reach.

Half the desk work within reach
Already

On the chosen pace and reliability. Estimate.

Share of the working time within reach, now to 2030

0%25%50%75%100%2027202820292030NowDesk work: 74% of the time
Chosen to Ceiling: the share
DateNow
NowEnd of 2030
Change assumptionsLong-run pace, four in five

What each choice means: , , , , . Every pace starts from .

At this date and pace, models finish tasks up to 2.4 work days long four times in five.

How far this has come

With GPT-4, measured in March 2023, 0% of this job's working time was within reach at . With Claude 3.7 Sonnet, measured in February 2025, 0%. With Claude Mythos Preview (early), measured in April 2026, 9%. Today's estimate: 43%.

0%10%20%30%40%50%2023202420252026GPT-4, March 2023: 0% within reachGPT-4 Turbo (Nov 2023), November 2023: 0% within reachGPT-4o, May 2024: 0% within reachClaude 3.5 Sonnet (June 2024), June 2024: 0% within reacho1-preview, September 2024: 0% within reachClaude 3.5 Sonnet (Oct 2024), October 2024: 0% within reacho1, December 2024: 0% within reachClaude 3.7 Sonnet, February 2025: 0% within reacho3, April 2025: 1% within reachGPT-5, August 2025: 1% within reachGemini 3 Pro, November 2025: 2% within reachClaude Opus 4.5, November 2025: 2% within reachGPT-5.2, December 2025: 3% within reachClaude Opus 4.6, February 2026: 3% within reachClaude Mythos Preview (early), April 2026: 9% within reachToday (estimate), November 2026: 43% within reach
Each step is a new best model measured by METR, four in five; the dashed end is today's estimate. Point at a dot for the model.

A backcast: today's task data with the best model METR had measured by each date. It shows how fast the models have moved, not what anyone forecast at the time.

Measured use over time

Of the Claude.ai conversations Anthropic sampled and tied to a work task, no reportable share went to this job's tasks in May 2026; 0 of its 17 tasks showed up. Within each of Anthropic's methods, never across a change: 0.0064% to 0.0051% (released February and March 2025); none to 0.0029% (August 2025 to February 2026).

0%0.005%0.01%20252026released February 2025: 0.0064%released March 2025: 0.0051%the week of Aug 4, 2025: nonethe week of Nov 13, 2025: 0.0033%the week of Feb 5, 2026: 0.0029%April 2026: noneMay 2026: none
Each dot is one release's sample. A line joins releases made by the same method; a change of method starts a new line. Point at a dot for its window.
Each release
ConversationsShareRankTasks seen
Released February 20250.0064%581 of 7081 of 17
Released March 20250.0051%581 of 7031 of 17
The week of Aug 4, 2025nonen/a0 of 17
The week of Nov 13, 20250.0033%610 of 6721 of 17
The week of Feb 5, 20260.0029%614 of 6771 of 17
April 2026nonen/a0 of 17
May 2026nonen/a0 of 17

Measured, not estimated: Anthropic's samples of Claude.ai conversations, each tied by a model to an O*NET task, from the Anthropic Economic Index. It says where Claude's use goes, not how much of this job's working time it covers, so it is not on the same scale as the reach above. The releases differ in their sample, their classifier and the smallest share they report (the June 2026 file rounds each task to a hundredth of a percent, so a smaller task reads as none), which is why a change of method starts a new line. At least 96% of each older release's task-tied use matched this site's tasks, and all of the newest. Claude.ai only, so use through other tools and other companies' models is not in it. Every job ranked.

Robots and the physical work

Anthropic rates 13% of this job's working time as physical work. For 11% of the working time, a robot has been shown doing most of the task somewhere: 11% in a structured facility. 0.22 of 3, the 424th highest of the 923 jobs.

  • Not physical 87%
  • No robot shown 2%
  • In a structured facility 11%

Anthropic's rating, not this site's estimate: Claude Opus 5, searching the web, rated each physical O*NET task by the kind of setting in which a robot it could cite (deployed, sold or demonstrated) does most of the task, weighted by its own estimate of each task's share of the time (What work can robots do?, September 30, 2026, data CC BY 4.0; every job ranked). A robot shown somewhere is not a robot in your building: cost, setup and safety decide that. The share within reach on this page still counts no body work. The robot behind each rated task is under the task below.

The tasks

Sorted by . 17 tasks from .

TaskKind
Develop operating plans and schedules for geothermal operations.Done daily by most who do it. 15%1.3 work days3.3 h to 2.5 work days60%Half by now
Develop or manage budgets for geothermal operations.Done daily by most who do it. 15%1.7 work days3.3 h to 4.2 work days31%Half by Mar 2027
Oversee geothermal plant operations, maintenance, and repairs to ensure compliance with applicable standards or regulations.Done daily by most who do it. 12%3.3 h50 min to 6.7 h91%Half by now
Identify opportunities to improve plant electrical equipment, controls, or process control methodologies.Done more than yearly by most who do it. 9%6.7 h1.7 h to 2.5 work days55%Half by now
Supervise employees in geothermal power plants or well fields.Done daily by most who do it. 9%1.7 h25 min to 5 hStays with people
Identify and evaluate equipment, procedural, or conditional inefficiencies involving geothermal plant systems.Done daily by most who do it. 7%3.3 h50 min to 1.7 work days71%Half by now
Select and implement corrosion control or mitigation systems for geothermal plants.Done yearly or less by most who do it. 6%2.1 work days6.7 h to 1.7 work weeks23%Half by May 2027
Conduct well field site assessments.Done more than weekly by most who do it. Robots: in a structured facility, Spot (with Orbit) at Onikobe Geothermal Power Plant (Boston Dynamics / Tohoku Enterprise (TECO) for J-POWER) (deployed). Anthropic's rating.6%6.7 h1.7 h to 1.7 work daysStays with people
Inspect geothermal plant or injection well fields to verify proper equipment operations.Done more than weekly by most who do it. Robots: in a structured facility, Spot with Orbit (Boston Dynamics) (deployed). Anthropic's rating.5%2.5 h50 min to 5 hStays with people
Perform or direct the performance of preventative maintenance on geothermal plant equipment.Done more than weekly by most who do it. 4%2.5 h50 min to 7.5 hStays with people
Monitor geothermal operations, using programmable logic controllers.Done daily by most who do it. 4%1.3 h25 min to 3.3 h99%Half by now
Prepare environmental permit applications or compliance reports.Done more than yearly by most who do it.2%2.1 work days6.7 h to 1 work week31%Half by Feb 2027

Within reach, per task: the share of the task's time whose instances are short enough for a model to finish at the chosen date, pace and reliability. Half by: the date half of that time comes within reach.

Jobs that share skills with this one

From O*NET's related occupations. Within reach now and by the end of 2028, long-run pace, four in five.

Where this job works

The industry groups that employ the most of it (BLS, May 2025). Counts are for the broader BLS group this job sits in.

Where the most of these jobs are

The metro areas with the most people in it (BLS, May 2025). Counts are for the broader BLS group this job sits in.

Questions about this job

How much of the work of Geothermal Production Managers is within reach of AI now?
An estimated 43% of the working time is within reach of AI models now and 74% by the end of 2028, on METR's long-run pace at four in five (70% to 74% across the three paces the site shows). Within reach means a model could finish work that long at that reliability. It is not a forecast of jobs lost or of savings.
Which tasks of Geothermal Production Managers come within reach first?
Weighted by the time each takes, the tasks with the most within reach now (projected from METR's April 2026 measurement and Epoch's November 2026 index) are: Oversee geothermal plant operations, maintenance, and repairs to ensure compliance with applicable standards or regulations (91% of the task's time now, 100% by the end of 2028); Develop operating plans and schedules for geothermal operations (60% of the task's time now, 100% by the end of 2028); and Identify opportunities to improve plant electrical equipment, controls, or process control methodologies (55% of the task's time now, 100% by the end of 2028).
Which tasks of Geothermal Production Managers stay with people?
Tasks that are people work or body work are not counted as within reach at any date. The largest: Supervise employees in geothermal power plants or well fields; Conduct well field site assessments; and Inspect geothermal plant or injection well fields to verify proper equipment operations. Together such tasks are about 26% of the working time.
Do people already use AI for the work of Geothermal Production Managers?
In the Claude.ai conversations Anthropic sampled for May 2026, no reportable share went to this job's tasks. Anthropic's labor market measure puts the share of the job's tasks seen in real Claude use at work at 1%. These are measures of use, not of how much of the work AI could finish, and they cover Claude only.
Can robots do the physical work of Geothermal Production Managers?
Anthropic's robot exposure rating (September 2026) finds 13% of the working time is physical work, and that a robot has been shown doing most of the task, somewhere, for 11% of the working time, 11% in a structured facility. Its index is 0.22 of 3. One example: Spot (with Orbit) at Onikobe Geothermal Power Plant for "conduct well field site assessments". A robot shown somewhere is not one in every workplace; this site's own estimates still count no physical work as within reach.
How is this estimated?
From the 17 tasks O*NET lists for the occupation, each with an estimated length checked against GDPval and a share of the working time, each classed as desk, people or body work, and METR's measurements of how long a task the best AI models can finish, carried forward to the date from the latest, Claude Mythos Preview (early) in April 2026. Data checked November 10, 2026.

How the estimates are made

This job in your state or metro area
Embed these figures on your site

A small card with the share of working time within reach now and at the end of 2027, 2028 and 2030, the date and a link back. Free under CC BY 4.0; the card carries the credit.

See the card

Your own version of this job

The page above is the occupation. Your job is your title and what you actually do: give both, and they are read against these tasks in your browser, nothing sent anywhere. The headline is free: how much of your working time is within reach now and by the end of 2028, and how many of the tasks your description names.

This occupation has not been reviewed task by task yet, so the full personal report is not offered for it; 402 of 923 occupations are reviewed so far, largest first.